VANCOUVER, British Columbia, June 23, 2020 (GLOBE NEWSWIRE) — Skyharbour Resources Ltd. (TSX-V: SYH) (OTCQB: SYHBF)(Frankfurt: SC1P) (the “Company”) is pleased to announce the results from its 2020 winter/spring diamond drilling program at its 100% owned,  35,705 hectare Moore Uranium Project, approximately 15 kilometres east of Denison Mine’s Wheeler River project and proximal to regional infrastructure for Cameco’s Key Lake/McArthur River operations in the Athabasca Basin, Saskatchewan. Drill hole ML20-04 doubled the known strike extent of the Maverick East Zone by intersecting a discrete basement-hosted zone of uranium mineralization from 273.9 metres to 278.4 metres downhole. The interval returned 4.5 metres of 0.38% U3O8 with a basal high grade basement intercept returning 0.5 metres of 1.43% U3O8. Additional drilling in the Maverick East confirmed the continuity and structural control of the zone both internally and peripherally. A greater understanding of the Maverick Structural Corridor was also obtained by additional drilling in the Viper and Maverick NE target areas.