Skip to main content

Platinex Announces Further Expansion of W2 Copper-Nickel-PGE Project

TORONTO, March 17, 2022 (GLOBE NEWSWIRE) — Platinex Inc. (CSE: PTX) (Frankfurt: 9PX) (“Platinex” or the “Company”) is pleased to announce that its wholly owned subsidiary, Endurance Elements Inc. (“Endurance Elements”) has acquired 149 mining claims located along the western boundary of the W2 Copper-Nickel-PGE Project (the “W2 Project” or “W2”) in Ontario’s Ring of Fire (see press releases dated January 17, 2022 and January 27, 2022). The additional 2,932 hectares (29.3 km2) of ground brings the W2 land package to 15,973 hectares (159.7 km2). Endurance Elements holds a 100% interest in the W2 Project.

The W2 Project now covers approximately 80% of the layered mafic-ultramafic Lansdowne House Igneous Complex (“LHIC”) which is highly prospective for copper-nickel (Cu-Ni) and reef-type platinum group element (PGE) deposits. The widespread Cu-Ni-PGE mineralization is delineated in at least seven significant mineralized zones within a 7.5 km long folded corridor. The common thread of strong Cu-Ni-PGE, Cr and Ti-V mineralization in the mafic ultramafic intrusions ringing the Oxford Stull Dome is suggestive of a common source, a very large magmatic system and therefore a potential significant abundance of the metals in each intrusion.

The new claims add 10 km of strike length to the project with W2 extending 35 km along the Lavoie Lake Shear Zone System and tying on to Northern Superior Resources Inc.’s TPK Project (25.87 g/t Au over 13.5 m) in the west. In addition, new claims in the northern section of W2 cover the strike extension of a known Fe-Ti-V oxide horizon.

Per the previously announced purchase and sale agreement between Endurance Elements Inc. and Springer Mineral Resources Corporation (“Springer”), certain of the 149 mining claims are Additional Properties and subject to a 0.5% net smelter return (NSR) royalty in favour of Springer.

The Company is currently compiling historic data and developing exploration plans for W2. Additional information on the new claims and the W2 Project is available in a presentation on the Company’s website (www.platinex.com).

The information presented in this news release has been reviewed and approved by Ike Osmani, P. Geo, a consulting geologist of the Company and James R. Trusler, P.Eng., Chairman of Platinex Inc. and both are considered a qualified person for exploration at the W2 project, as defined by National Instrument 43-101, Standards for Disclosure for Mineral Projects.

About Platinex Inc.: Platinex creates shareholder value through the opportunistic acquisition and advancement of high-quality projects in prolific Ontario mining camps. Current assets include a 100% ownership interest in the district scale W2 Copper-Nickel-PGE Project and a 100% interest in the 225 km2 Shining Tree Gold Project in the Abitibi region of Ontario, a world-renowned gold district. The W2 Project controls one of the major Oxford Stull Dome complexes. The Shining Tree Project covers a major portion of the Ridout-Tyrrell deformation zone that trends as far west as Newmont’s Borden Mine, through the area of IAMGOLD’s Cote Gold deposit, and across Aris Gold’s Juby Project. The Company is also developing a net smelter return (NSR) royalty portfolio and currently holds royalties on gold, PGE, and base metal properties in Ontario.

For further information please contact, Mr. Greg Ferron, CEO at 416-270-5042 or via email at: gferron@platinex.com.

To receive Company press releases, please sign up on the website www.platinex.com.

FORWARD-LOOKING STATEMENTS:
This news release may contain forward-looking statements and information based on current expectations. These statements should not be read as guarantees of future performance or results. Such statements involve known and unknown risks, uncertainties and other factors that may cause actual results, performance or achievements to be materially different from those implied by such statements. Such statements include use proprietary data to seek financial backing to advance its platinum group properties, submission of the relevant documentation within the required timeframe and to the satisfaction of the relevant regulators, completing the acquisition of applicable assets and raising sufficient financing to complete the Company’s business strategy. There is no certainty that any of these events will occur. Although such statements are based on management’s reasonable assumptions, there can be no assurance that such assumptions will prove to be correct. We assume no responsibility to update or revise them to reflect new events or circumstances, except as required by applicable securities laws.

This press release shall not constitute an offer to sell or the solicitation of an offer to buy nor shall there be any sale of the securities in any province in which such offer, solicitation or sale would be unlawful. The securities issued, or to be issued, under the Private Placement have not been, and will not be, registered under the United States Securities Act of 1933, as amended, and may not be offered or sold in the United States absent registration or an applicable exemption from registration requirements.

The Canadian Securities Exchange has not approved nor disapproved the contents of this press release.

Disclaimer & Cookie Notice

Welcome to GOLDEA services for Professionals

Before you continue, please confirm the following:

Professional advisers only

I am a professional adviser and would like to visit the GOLDEA CAPITAL for Professionals website.

Important Notice for Investors:

The services and products offered by Goldalea Capital Ltd. are intended exclusively for professional market participants as defined by applicable laws and regulations. This typically includes institutional investors, qualified investors, and high-net-worth individuals who have sufficient knowledge, experience, resources, and independence to assess the risks of trading on their own.

No Investment Advice:

The information, analyses, and market data provided are for general information purposes only and do not constitute individual investment advice. They should not be construed as a basis for investment decisions and do not take into account the specific investment objectives, financial situation, or individual needs of any recipient.

High Risks:

Trading in financial instruments is associated with significant risks and may result in the complete loss of the invested capital. Goldalea Capital Ltd. accepts no liability for losses incurred as a result of the use of the information provided or the execution of transactions.

Sole Responsibility:

The decision to invest or not to invest is solely the responsibility of the investor. Investors should obtain comprehensive information about the risks involved before making any investment decision and, if necessary, seek independent advice.

No Guarantees:

Goldalea Capital Ltd. makes no warranties or representations as to the accuracy, completeness, or timeliness of the information provided. Markets are subject to constant change, and past performance is not a reliable indicator of future results.

Regional Restrictions:

The services offered by Goldalea Capital Ltd. may not be available to all persons or in all countries. It is the responsibility of the investor to ensure that they are authorized to use the services offered.

Please note: This disclaimer is for general information purposes only and does not replace individual legal or tax advice.