Skip to main content

Nokia completes Ceneri and Gotthard Base Tunnels communications infrastructure project

Press ReleaseNokia completes Ceneri and Gotthard Base Tunnels communications infrastructure projectNokia responsible for project management and tunnel control system delivery for Ceneri and Gotthard Base Tunnels
 
Nokia’s operations support system enables customized, real-time monitoring of Ceneri and Gotthard Base Tunnel communications infrastructure
 
Ceneri Base Tunnel completes New Railway Link through the Alps (NRLA), creates faster north-south Swiss Alps crossing, reduces environmental impact5 November 2020Espoo, Finland – Nokia has successfully completed the Ceneri Base Tunnel project for AlpTransit Gotthard AG, providing control technology management, monitoring and operations support systems in Ticino, Switzerland. Completion follows on from Nokia’s delivery work for the Gotthard Base Tunnel communications system, which has been merged with the Ceneri system.Over a six-year contract, Nokia services experts completed all Ceneri Base Tunnel control systems project delivery milestones on time, including overall final delivery in advance of the tunnel’s official opening. In its project delivery role, Nokia was responsible for supplier and interface management, requirement management processes, as well as comprehensive system and project documentation.Nokia also deployed an operations support system that identifies and consolidates events throughout the communications infrastructure of both base tunnels and performs root cause analysis for the rail-related services.Christopher Kennepohl, Head of Operational Processes, AlpTransit Gotthard AG, said: “In terms of project delivery and management, Nokia hit every milestone on time, fulfilling all KPI expectations. By applying its considerable skills, experience and domain expertise, Nokia was fundamental to successful project realization.“Nokia’s operations support system  provides the intelligence that feeds the Swiss Federal Railways’ Pollegio operations center, enabling real-time insights to be delivered across a range of parameters and identifying alarms for intervention and error handling – this is vital to tunnel safety, security and smooth running.”Nokia’s operations support system integrates network components from several third-party technology providers, including two data networks, a video surveillance system, two tunnel radios and two emergency communication systems. It handles subsystem interfaces across various protocols as well as information exchange with existing systems of the Swiss Federal Railways (SBB) infrastructure.Raoul Harlacher, General Project Manager, Nokia, said: “On behalf of the entire delivery team it makes us proud to be part of this ‘project of the century’ and to support AlpTransit Gotthard, SBB and Switzerland in its goal to enhance the environmentally compatible transport of goods by rail. And in addition, cutting the total journey time for passenger traffic between Zurich and Milano by up to an hour”.Nokia has previously deployed communications infrastructure to support mission-critical operational and passenger services at the Gotthard Base Tunnel project. As part of this latest project, Nokia integrated Ceneri Base Tunnel communications infrastructure into the Gotthard Tunnel operation control system.The Ceneri and Gotthard Base Tunnels feature state-of-the-art control technologies and monitoring devices connected to the operations center via fiber optic cables, with around 70,000 data points and more than 200,000 sensors registering variables such as entry access, air quality, ventilation, fire detection and much more. In addition, a multitude of systems manage tunnel lighting, fire and smoke alarms, power supply, fire extinguishing, hazardous materials recognition, ventilation and emergency call systems.The Ceneri Base Tunnel
The Ceneri Base Tunnel, which has been handed over to Swiss Federal Railways will commence service in December 2020. As part of the New Railway Link through the Alps project it is designed to deliver faster rail links across the Swiss Alps with the tunnel representing a key part of the Swiss policy to transfer freight traffic from road to rail.
When in full operation, the Ceneri Base Tunnel will become an important southern feeder for the Gotthard Base Tunnel, as existing track over Monte Ceneri is not suitable for high-speed rail or heavy freight trains. Composed of two single-track tunnels, each 15.4 km (9.6 miles) long it bypasses the former high-altitude rail route through the Monte Ceneri Tunnel.About Nokia
We create the technology to connect the world. Only Nokia offers a comprehensive portfolio of network equipment, software, services and licensing opportunities across the globe. With our commitment to innovation, driven by the award-winning Nokia Bell Labs, we are a leader in the development and deployment of 5G networks. 
Our communications service provider customers support more than 6.4 billion subscriptions with our radio networks, and our enterprise customers have deployed over 1,300 industrial networks worldwide. Adhering to the highest ethical standards, we transform how people live, work and communicate. For our latest updates, please visit us online www.nokia.com  and follow us on Twitter @nokia.Media Inquiries:NokiaCommunicationsPhone: +358 10 448 4900Email: press.services@nokia.com 

Disclaimer & Cookie Notice

Welcome to GOLDEA services for Professionals

Before you continue, please confirm the following:

Professional advisers only

I am a professional adviser and would like to visit the GOLDEA CAPITAL for Professionals website.

Important Notice for Investors:

The services and products offered by Goldalea Capital Ltd. are intended exclusively for professional market participants as defined by applicable laws and regulations. This typically includes institutional investors, qualified investors, and high-net-worth individuals who have sufficient knowledge, experience, resources, and independence to assess the risks of trading on their own.

No Investment Advice:

The information, analyses, and market data provided are for general information purposes only and do not constitute individual investment advice. They should not be construed as a basis for investment decisions and do not take into account the specific investment objectives, financial situation, or individual needs of any recipient.

High Risks:

Trading in financial instruments is associated with significant risks and may result in the complete loss of the invested capital. Goldalea Capital Ltd. accepts no liability for losses incurred as a result of the use of the information provided or the execution of transactions.

Sole Responsibility:

The decision to invest or not to invest is solely the responsibility of the investor. Investors should obtain comprehensive information about the risks involved before making any investment decision and, if necessary, seek independent advice.

No Guarantees:

Goldalea Capital Ltd. makes no warranties or representations as to the accuracy, completeness, or timeliness of the information provided. Markets are subject to constant change, and past performance is not a reliable indicator of future results.

Regional Restrictions:

The services offered by Goldalea Capital Ltd. may not be available to all persons or in all countries. It is the responsibility of the investor to ensure that they are authorized to use the services offered.

Please note: This disclaimer is for general information purposes only and does not replace individual legal or tax advice.