Skip to main content

HII Completes Dry Dock Work for Aircraft Carrier USS John C. Stennis (CVN 74) Refueling and Complex Overhaul

NEWPORT NEWS, Va., April 08, 2024 (GLOBE NEWSWIRE) —  HII’s (NYSE: HII) Newport News Shipbuilding division has completed the dry dock portion of the refueling and complex overhaul (RCOH) of Nimitz-class aircraft carrier USS John C. Stennis (CVN 74).

Following the recent flooding of more than 100 million gallons of water into the dry dock, USS John C. Stennis was successfully moved to an outfitting berth at the shipyard, where the remainder of the RCOH work and testing will be completed.

“Witnessing Stennis leave the dry dock and return to the water is a testament to the hard work of our shipbuilders, the crew and our government partners,” said Rob Check, NNS vice president of in-service aircraft carrier programs. “We remain laser focused on the work ahead during this RCOH period and look forward to preparing this mighty aircraft carrier for the next half of its operational life.”

DCS24-72-198

Photos accompanying this release are available at: https://hii.com/news/hii-aircraft-carrier-uss-john-c-stennis-cvn-74-refueling-and-complex-overhaul-drydock/.  

During the dry dock phase of the RCOH, USS John C. Stennis received significant upgrades and began an extensive overhaul process, both inside and outside the ship. In addition to defueling and refueling its power plant, NNS shipbuilders preserved tanks and replaced thousands of valves, pumps and piping components. On the outside, they performed major structural updates to the island, mast and antenna tower; upgraded all aircraft launch and recovery equipment; painted the ship’s hull, including sea chests and freeboard; restored the propeller shafts; and installed refurbished propellers and rudders.

During the next phase of RCOH, shipbuilders will complete the overhaul and installation of the ship’s major components and test its electronics, combat and propulsion systems. This period will also focus on improving the ship’s living areas, including crew living spaces, galleys and mess decks.

“Our focus remains steadfast to get our ship back into the fight and to foster the professional and personal development of our sailors,” said Capt. J. Patrick Thompson III, the ship’s commanding officer. “We look forward to continue working with our industry partners to complete remaining production and test work and redeliver Stennis back to the fleet.”

USS John C. Stennis is the seventh Nimitz-class aircraft to undergo its RCOH — the mid-life refueling overhaul and maintenance availability that produces a recapitalized carrier capable of supporting current and future Navy requirements. Once the RCOH is complete, USS John C. Stennis will be equipped to operate in the fleet for the second half of her 50-year expected service life.

About HII

HII is a global, all-domain defense provider. HII’s mission is to deliver the world’s most powerful ships and all-domain solutions in service of the nation, creating the advantage for our customers to protect peace and freedom around the world.

As the nation’s largest military shipbuilder, and with a more than 135-year history of advancing U.S. national security, HII delivers critical capabilities extending from ships to unmanned systems, cyber, ISR, AI/ML and synthetic training. Headquartered in Virginia, HII’s workforce is 44,000 strong. For more information, visit:

Contact:

Todd Corillo

Todd.T.Corillo@hii-co.com

(757) 688-3220

A photo accompanying this announcement is available at https://www.globenewswire.com/NewsRoom/AttachmentNg/94abb0bc-939e-45b6-9faa-880087fff109

Disclaimer & Cookie Notice

Welcome to GOLDEA services for Professionals

Before you continue, please confirm the following:

Professional advisers only

I am a professional adviser and would like to visit the GOLDEA CAPITAL for Professionals website.

Important Notice for Investors:

The services and products offered by Goldalea Capital Ltd. are intended exclusively for professional market participants as defined by applicable laws and regulations. This typically includes institutional investors, qualified investors, and high-net-worth individuals who have sufficient knowledge, experience, resources, and independence to assess the risks of trading on their own.

No Investment Advice:

The information, analyses, and market data provided are for general information purposes only and do not constitute individual investment advice. They should not be construed as a basis for investment decisions and do not take into account the specific investment objectives, financial situation, or individual needs of any recipient.

High Risks:

Trading in financial instruments is associated with significant risks and may result in the complete loss of the invested capital. Goldalea Capital Ltd. accepts no liability for losses incurred as a result of the use of the information provided or the execution of transactions.

Sole Responsibility:

The decision to invest or not to invest is solely the responsibility of the investor. Investors should obtain comprehensive information about the risks involved before making any investment decision and, if necessary, seek independent advice.

No Guarantees:

Goldalea Capital Ltd. makes no warranties or representations as to the accuracy, completeness, or timeliness of the information provided. Markets are subject to constant change, and past performance is not a reliable indicator of future results.

Regional Restrictions:

The services offered by Goldalea Capital Ltd. may not be available to all persons or in all countries. It is the responsibility of the investor to ensure that they are authorized to use the services offered.

Please note: This disclaimer is for general information purposes only and does not replace individual legal or tax advice.