VANCOUVER, British Columbia, Oct. 16, 2025 (GLOBE NEWSWIRE) — Cornish Metals Inc. (AIM/TSXV: CUSN) (“Cornish Metals” or the “Company”) is pleased to report that it has filed a technical report pursuant to National Instrument 43-101 – Standards for Disclosure for Mineral Projects (“NI 43-101”) for its wholly owned and permitted South Crofty tin project in Cornwall, United Kingdom under Cornish Metals’ profile on Sedar+ (www.sedarplus.com) and is also available at www.cornishmetals.com.

The Company’s news release dated September 29, 2025 summarises the positive results of the updated Preliminary Economic Assessment (“PEA”), see highlights below:

Highlights

  • Reinforced leadership team delivering global best practice
    • Newly appointed General Manager and Project Director have aligned the project with global best practice across current works, project delivery and eventual operations
    • Top-tier third party consultants have independently verified all project parameters—from technical design to real time cost estimation—ensuring rigour, transparency, and execution confidence
  • Solid project economics and cash generation
    • £180 million after-tax NPV6% Real and 20% IRR at a tin price of US$33,900 /tonne
    • £237 million pre-tax NPV6% Real and 23% IRR
    • Capital payback period of 3.3 years after-tax after start of production
    • Cumulative after-tax cash flow of approximately £558 million from start of production
    • Average annual after-tax cash flow of approximately £57 million in years two through six
    • Average annual EBITDA of £70 million and 62% EBITDA margin in years two through six which is expected to be sustained when additional Mineral Resources are added from planned underground drilling of known orebody extensions
  • A low-cost, high-grade, responsible tin operation with strong ESG credentials
    • Lowest quartile producer – Average AISC of approximately US$13,420 /tonne of payable tin for years two through six, US$14,460 /tonne over LOM, positioning South Crofty in the lowest quartile of the cost curve
    • Average annual tin production of approximately 4,700 tonnes for years two through six (equivalent to approximately 1.6% of global mined tin production)
    • Average pre-concentrated head grade of 2.11% tin in years two through six, upgraded from an average mined grade of 1.04% tin
    • Low impact underground operation with no surface tailings disposal
    • Use of 100% renewable electricity supply with renewable power generation optionality
    • Potential to directly employ over 300 people and create up to 1,000 indirect jobs
  • Sizeable Exploration Target potential
    • Near mine Exploration Target points to potential additional mineralisation of 6 to 13 million tonnes (“Mt”), at a tin grade of 0.5% to 1.8%
    • South Crofty has a record of consistently replacing mined tonnes to extend its life of mine and the Company is targeting a continuation of this trend
    • The Company has good visibility on higher grade extensions that can allow a further optimised mine plan in due course subject to exploration drilling success
    • The Company has developed a resource drilling programme that is planned to commence with the start of underground development and continue alongside production
    • Further growth opportunities from longer term exploration within the South Crofty mining permission area and within Cornish Metals’ extensive mineral rights holdings in Cornwall
  • Well supported project
    • Support from local communities and government, and UK government
    • Permitted project with existing mine infrastructure, mining permission through to 2071 and full planning permission to construct the processing plant to recover tin concentrate

The technical report, titled “South Crofty PEA Update” (the “Technical Report”) was prepared by AMC Consultants (UK) Limited on behalf of Cornish Metals. The Qualified Persons (“QPs”) for the updated PEA are Mr Dominic Claridge, FAusIMM, Principal Mining Engineer (AMC); Mr Nick Szebor, MCSM, CGeol, EurGeol, FGS, Director/Global Lead – Geosciences and Principal Geologist (AMC); Mr Mike Hallewell, FIMMM, FSAIMM, FMES, CEng (Independent Consultant); Mr Barry Balding, PGeo, EurGeol, Technical Director – Mining Advisory Europe (SLR); Mr Steve Wilson, ACSM, CEng, FIMMM, Managing Director: Europe (P&C). Qualified Persons under National Instrument 43-101 (NI 43-101) and Competent Persons as defined under the JORC Code (2012).

This news release has been reviewed and approved by Mr Stephen Holley, (BSc (Hons), ACSM, MSc, MSCM, CEng FIMMM), Technical Services Manager for Cornish Metals Inc, who is the designated QP for the Company.

ABOUT CORNISH METALS

Cornish Metals is a mineral exploration and development company that is advancing the South Crofty tin project towards production. South Crofty:

  • is a historical, high-grade, underground tin mine located in Cornwall, United Kingdom and benefits from existing mine infrastructure including multiple shafts that can be used for future operations;
  • is permitted to commence underground mining (valid to 2071), construct a new processing facility and for all necessary site infrastructure;
  • would be the only primary producer of tin in Europe or North America. Tin is a Critical Mineral as defined by the UK, American, and Canadian governments as it is used in almost all electronic devices and electrical infrastructure. Approximately two-thirds of the tin mined today comes from China, Myanmar and Indonesia;
  • benefits from strong local community, regional and national government support with a growing team of skilled people, local to Cornwall, and could generate over 300 direct jobs.

ON BEHALF OF THE BOARD OF DIRECTORS

“Don Turvey”
Don Turvey
CEO and Director

Engage with us directly at our investor hub. Sign up at: https://investors.cornishmetals.com/link/P2zo3P

For additional information please contact:

Cornish MetalsFawzi Hanano
Irene Dorsman
investors@cornishmetals.com
info@cornishmetals.com
Tel: +1 (604) 200 6664
   
SP Angel Corporate Finance LLP
(Nominated Adviser & Joint Broker)
Richard Morrison
Charlie Bouverat
Grant Barker
Tel: +44 203 470 0470
   
Hannam & Partners
(Joint Broker)
Matthew Hasson
Andrew Chubb
Jay Ashfield
cornish@hannam.partners
Tel: +44 207 907 8500
   
BlytheRay
(Financial PR)
Tim Blythe
Megan Ray
Said Izagaren
cornishmetals@blytheray.com
Tel: +44 207 138 3204
   

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Caution regarding forward looking statements

This news release may contain certain “forward-looking information” and “forward-looking statements” (collectively, “forward-looking statements”). Forward-looking statements include predictions, projections, outlook, guidance, estimates and forecasts and other statements regarding future plans, the realisation, cost, timing and extent of mineral resource or mineral reserve estimates, estimation of commodity prices, currency exchange rate fluctuations, estimated future exploration expenditures, costs and timing of the development of new deposits, success of exploration activities, permitting time lines, requirements for additional capital and the Company’s ability to obtain financing when required and on terms acceptable to the Company, future or estimated mine life and other activities or achievements of Cornish Metals. Forward-looking statements are often, but not always, identified by the use of words such as “seek”, “anticipate”, “believe”, “plan”, “estimate”, “forecast”, “expect”, “potential”, “project”, “target”, “schedule”, “budget” and “intend” and statements that an event or result “may”, “will”, “should”, “could”, “would” or “might” occur or be achieved and other similar expressions and includes the negatives thereof. All statements other than statements of historical fact included in this news release, are forward-looking statements that involve various risks and uncertainties and there can be no assurance that such statements will prove to be accurate and actual results and future events could differ materially from those anticipated in such statements.

Forward-looking statements are subject to risks and uncertainties that may cause actual results to be materially different from those expressed or implied by such forward-looking statements, including but not limited to: risks related to receipt of regulatory approvals, risks related to general economic and market conditions; risks related to the availability of financing; the timing and content of upcoming work programmes; actual results of proposed exploration activities; possible variations in Mineral Resources or grade; projected dates to commence mining operations; failure of plant, equipment or processes to operate as anticipated; accidents, labour disputes, title disputes, claims and limitations on insurance coverage and other risks of the mining industry; changes in national and local government regulation of mining operations, tax rules and regulations. The list is not exhaustive of the factors that may affect Cornish’s forward-looking statements.

Cornish Metals’ forward-looking statements are based on the opinions and estimates of management and reflect their current expectations regarding future events and operating performance and speak only as of the date such statements are made. Although the Company has attempted to identify important factors that could cause actual actions, events or results to differ from those described in forward- looking statements, there may be other factors that cause such actions, events or results to differ materially from those anticipated. There can be no assurance that forward-looking statements will prove to be accurate and accordingly readers are cautioned not to place undue reliance on forward-looking statements. Cornish Metals does not assume any obligation to update forward-looking statements if circumstances or management’s beliefs, expectations or opinions should change other than as required by applicable law.

Disclaimer & Cookie Notice

Welcome to GOLDEA services for Professionals

Before you continue, please confirm the following:

Professional advisers only

I am a professional adviser and would like to visit the GOLDEA CAPITAL for Professionals website.

Important Notice for Investors:

The services and products offered by Goldalea Capital Ltd. are intended exclusively for professional market participants as defined by applicable laws and regulations. This typically includes institutional investors, qualified investors, and high-net-worth individuals who have sufficient knowledge, experience, resources, and independence to assess the risks of trading on their own.

No Investment Advice:

The information, analyses, and market data provided are for general information purposes only and do not constitute individual investment advice. They should not be construed as a basis for investment decisions and do not take into account the specific investment objectives, financial situation, or individual needs of any recipient.

High Risks:

Trading in financial instruments is associated with significant risks and may result in the complete loss of the invested capital. Goldalea Capital Ltd. accepts no liability for losses incurred as a result of the use of the information provided or the execution of transactions.

Sole Responsibility:

The decision to invest or not to invest is solely the responsibility of the investor. Investors should obtain comprehensive information about the risks involved before making any investment decision and, if necessary, seek independent advice.

No Guarantees:

Goldalea Capital Ltd. makes no warranties or representations as to the accuracy, completeness, or timeliness of the information provided. Markets are subject to constant change, and past performance is not a reliable indicator of future results.

Regional Restrictions:

The services offered by Goldalea Capital Ltd. may not be available to all persons or in all countries. It is the responsibility of the investor to ensure that they are authorized to use the services offered.

Please note: This disclaimer is for general information purposes only and does not replace individual legal or tax advice.