Skip to main content

Baker Hughes to Supply Integrated Subsea, Completion Systems for Turkish Petroleum’s Sakarya Gas Field Phase 3

  • Technologies will optimize offshore production in the Sakarya Gas Field
  • Baker Hughes to deliver deepwater horizontal tree systems with associated technology
  • Integrated approach will enhance operating efficiencies

HOUSTON and LONDON, Sept. 11, 2025 (GLOBE NEWSWIRE) — Baker Hughes (NASDAQ: BKR), an energy technology company, announced Thursday a significant award from Turkish Petroleum (TPAO) and Turkish Petroleum Offshore Technology Center (TP-OTC) to supply subsea production and intelligent completion systems in the country’s strategic Sakarya Gas Field Phase 3.

Through the agreement, Baker Hughes will provide deepwater horizontal tree systems with associated subsea structures and control systems to support production at depths from 6,500 to 7,200 feet. The company’s advanced, intelligent upper and lower completions systems will provide enhanced, multizonal control of subsurface operations.

“The development of the Sakarya gas fields has transformed Turkiye’s energy sector, leading to a more prosperous, secure future for the country,” said Amerino Gatti, executive vice president of Oilfield Services & Equipment at Baker Hughes. “By bringing to bear our unique combination of subsea and completions technologies alongside our operational expertise and subsurface insights, Baker Hughes, TPAO and TP-OTC are able to collaboratively unlock these crucial hydrocarbons that will power Turkiye for decades to come.”

Baker Hughes has collaborated with TPAO and TP-OTC in the Sakarya Gas Field since development began in 2022. The company’s GaffneyClineTM energy advisory team has worked closely with TPAO and TP-OTC on reservoir and technology evaluations for the field’s unique subsurface geology. Baker Hughes has also provided advanced lower completions solutions ideally suited to optimize production in thin-layered reservoirs like those found in the Black Sea.

During Phase 3, Baker Hughes’ completions technologies, including InForceTM HCMTM-A interval control valves, SureTREATTM chemical injection valves, SureSENSTM QPT ELITE gauges, REACHTM subsurface safety valves and SC-XPTM Select Zero Loss stack-pack system, will be integrated with subsea production systems to create new engineering and operational efficiencies.

Deliveries and execution supporting Sakarya Gas Field Phase 3 will begin in late 2025.

About Baker Hughes
Baker Hughes (NASDAQ: BKR) is an energy technology company that provides solutions to energy and industrial customers worldwide. Built on a century of experience and conducting business in over 120 countries, our innovative technologies and services are taking energy forward – making it safer, cleaner and more efficient for people and the planet. Visit us at bakerhughes.com.

For more information, please contact:

Media Relations

Brian Reynolds
+1 363-315-6663
brian.reynolds@bakerhughes.com

Investor Relations

Chase Mulvehill
+1 346-297-2561
investor.relations@bakerhughes.com
   

Disclaimer & Cookie Notice

Welcome to GOLDEA services for Professionals

Before you continue, please confirm the following:

Professional advisers only

I am a professional adviser and would like to visit the GOLDEA CAPITAL for Professionals website.

Important Notice for Investors:

The services and products offered by Goldalea Capital Ltd. are intended exclusively for professional market participants as defined by applicable laws and regulations. This typically includes institutional investors, qualified investors, and high-net-worth individuals who have sufficient knowledge, experience, resources, and independence to assess the risks of trading on their own.

No Investment Advice:

The information, analyses, and market data provided are for general information purposes only and do not constitute individual investment advice. They should not be construed as a basis for investment decisions and do not take into account the specific investment objectives, financial situation, or individual needs of any recipient.

High Risks:

Trading in financial instruments is associated with significant risks and may result in the complete loss of the invested capital. Goldalea Capital Ltd. accepts no liability for losses incurred as a result of the use of the information provided or the execution of transactions.

Sole Responsibility:

The decision to invest or not to invest is solely the responsibility of the investor. Investors should obtain comprehensive information about the risks involved before making any investment decision and, if necessary, seek independent advice.

No Guarantees:

Goldalea Capital Ltd. makes no warranties or representations as to the accuracy, completeness, or timeliness of the information provided. Markets are subject to constant change, and past performance is not a reliable indicator of future results.

Regional Restrictions:

The services offered by Goldalea Capital Ltd. may not be available to all persons or in all countries. It is the responsibility of the investor to ensure that they are authorized to use the services offered.

Please note: This disclaimer is for general information purposes only and does not replace individual legal or tax advice.