Skip to main content

Anfield Engages Engineering Firm for Anticipated Resource Upgrade at Slick Rock

VANCOUVER, British Columbia, Aug. 02, 2024 (GLOBE NEWSWIRE) — Anfield Energy Inc. (TSX.V: AEC; OTCQB: ANLDF; FRANKFURT: 0AD) (“Anfield” or “the Company”) is pleased to announce that it is to engage BRS, Inc., an engineering firm, to complete an updated uranium and vanadium resource for its Slick Rock property. The Company previously received final approvals for its drill permit application to commence a 20-hole, 20,000-foot rotary drill program at its Slick Rock uranium and vanadium project, located in San Miguel County, Colorado. Anfield is in the process of securing a local drilling contractor, after which it will commence its 20-hole drill program at Slick Rock. Once the drill program is complete, Anfield plans to both secure a large mine permit for this property and use the drill results to upgrade its uranium and vanadium resource for Slick Rock as found in its existing PEA.

Corey Dias, Anfield’s CEO commented: “We are very pleased to bring BRS onboard as we advance our Slick Rock project. BRS previously completed a PEA for a combination of our Slick Rock, Velvet-Wood and Shootaring mill projects; therefore, leveraging that experience with the Company’s Slick Rock project – post-drilling – to both confirm existing historical results and provide an updated uranium and vanadium resource is warranted. As we aim to meet the criteria for a large mine permit, followed by a Plan of Operations, we intend to align the development timelines of both the Slick Rock and Velvet-Wood mines. Our aim is to have both ready for production prior to the restart of the Shootaring Canyon mill, with initial feed ready for transport once the mill is ready to receive it.”

Additionally, the Company announces that a Director has provided a one-year loan of $1.65 million, with an effective annual interest rate of 10%, for working capital purposes. The loan is considered a “related party transaction” as defined under Multilateral Instrument 61-101 – Protection of Minority Securityholders in Special Transactions (“MI 61-101”). The Company has relied on the exemptions from the formal valuation and minority shareholder approval requirements of MI 61-101 pursuant to subsections 5.5(a) and 5.7(1)(a) of MI 61-101, as the loan does not exceed 25% of the Company’s market capitalization.

Qualified Persons

Douglas L. Beahm, P.E., P.G., principal engineer at BRS Inc., is a Qualified Person as defined in NI 43-101 and has reviewed and approved the technical content of this news release.

About Anfield

Anfield is a uranium and vanadium development and near-term production company that is committed to becoming a top-tier energy-related fuels supplier by creating value through sustainable, efficient growth in its assets. Anfield is a publicly traded corporation listed on the TSX-Venture Exchange (AEC-V), the OTCQB Marketplace (ANLDF) and the Frankfurt Stock Exchange (0AD). Anfield is focused on its conventional asset centre, as summarized below:

Arizona/Utah/Colorado – Shootaring Canyon Mill

A key asset in Anfield’s portfolio is the Shootaring Canyon Mill in Garfield County, Utah. The Shootaring Canyon Mill is strategically located within one of the historically most prolific uranium production areas in the United States, and is one of only three licensed uranium mills in the United States.

Anfield’s conventional uranium assets consist of mining claims and state leases in southeastern Utah, Colorado, and Arizona, targeting areas where past uranium mining or prospecting occurred. Anfield’s conventional uranium assets include the Velvet-Wood Project, the Frank M Uranium Project, the West Slope Project, as well as the Findlay Tank breccia pipe. A NI 43-101 PEA has been completed for the Velvet-Wood Project. The PEA is preliminary in nature, and includes inferred mineral resources that are considered too speculative geologically to have economic considerations applied to them that would enable them to be categorized as mineral reserves and, resultantly, there is no certainty that the included preliminary economic assessment would be realized. All conventional uranium assets are situated within a 200-mile radius of the Shootaring Mill.

Technical Disclosure

Table 1. Anfield’s existing conventional uranium-vanadium project portfolio resources.

ProjectLocationClassificationTons (kt)Uranium
Grade
(% U3O8)
Contained Uranium
(Mlbs U3O8)
Vanadium
Grade
(% V2O5)
Contained Vanadium
(Mlbs V2O5)
Velvet-WoodUtahM & I8110.29%4.6
  Inferred870.32%0.60.404%7.3
West SlopeColoradoIndicated1,3670.197%5.4
  Inferred1,3670.984%26.9
  Historic*6300.31%3.91.59%20.0
Slick RockColoradoInferred1,7600.224%7.91.35%47.1
Frank MUtahHistoric*1,1370.101%2.3
Findlay TankArizonaHistoric*2110.226%1.0
Date
Creek/Artillery
Peak
ArizonaHistoric*2,6020.054%2.8  
        
Marquez-Juan TafoyaNew MexicoHistoric*7,1000.127%18.1  
 

* The Company’s Qualified Person has not done sufficient work to classify these historic estimates as current mineral resources and Anfield is not treating such historical resources as current mineral resources.

Velvet-Wood: The PEA for Velvet-Wood/Slick Rock was authored by Douglas L. Beahm, P.E., P.G. Principal Engineer, of BRS Inc., Harold H. Hutson, P.E., P.G., Carl D. Warren, P.E., P.G., and Terence P. (Terry) McNulty, P.E., D. Sc., of T.P. McNulty and Associates Inc. (May 6, 2023). Mineral resources are not mineral reserves and do not have demonstrated economic viability in accordance with CIM standards. GT cut-off varies by locality from 0.25%-0.50%.

West Slope: NI 43-101 resource estimate for the JD-6, JD-7, JD-8 and JD-9 properties, completed by BRS Inc. (effective March 2022); Historic resource estimate for the SR-11, SR-13A, SM-18 N, SM-18 S, LP-21 and CM-25 properties, completed by Behre Dolbear for Cotter Corporation (August 2007). Indicated and Inferred resources using GT cut-off of 0.1 ft% eU3O8; historic resources using cut-off of 0.05% U3O8.

Slick Rock: The PEA for Velvet-Wood/Slick Rock was authored by Douglas L. Beahm, P.E., P.G. Principal Engineer, of BRS Inc., Harold H. Hutson, P.E., P.G., Carl D. Warren, P.E., P.G., and Terence P. (Terry) McNulty, P.E., D. Sc., of T.P. McNulty and Associates Inc. (May 6, 2023). Mineral resources are not mineral reserves and do not have demonstrated economic viability in accordance with CIM standards. GT cut-off varies by locality from 0.25%-0.50%.

Frank M: Historic Technical Report for Frank M, prepared for Uranium One Americas, was authored by Douglas L. Beahm, P.E., P.G. Principal Engineer of BRS Inc., and Andrew C. Anderson, P.E., P.G. Senior Engineer/Geologist of BRS Inc., dated June 10, 2008. Frank M historic resource used a GT cut-off of 0.25%.

Findlay Tank: Historic Technical Report for Findlay Tank, prepared for Uranium One Americas, was authored by Douglas L. Beahm, P.E., P.G. Principal Engineer of BRS Inc., dated October 2, 2008. Findlay Tank historic resource used a grade cut-off of 0.05% eU3O8.

Artillery Peak: Artillery Peak Exploration Project, Mohave County, Arizona, 43-101 Technical Report, authored by Dr. Karen Wenrich, October 12, 2010. GT cut-off varies by locality from 0.01%-0.05%.

Marquez-Juan Tafoya: The Historical Technical Report, Preliminary Economic Assessment, for Marquez-Juan Tafoya, prepared for Uranium Energy Corporation, was authored by Douglas L. Beahm, P.E., P.G., Principal Engineer of BRS Inc., and Terence P. McNulty, P.E., PhD, McNulty & Associates, dated June 9, 2021. The mineral resources are reported at a 0.60 GT cut-off..

On behalf of the Board of Directors
ANFIELD ENERGY INC.
Corey Dias, Chief Executive Officer

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Contact:
Anfield Energy, Inc.
Clive Mostert
Corporate Communications
780-920-5044
contact@anfieldenergy.com
www.anfieldenergy.com

Safe Harbor Statement

THIS NEWS RELEASE CONTAINS “FORWARD-LOOKING STATEMENTS”. STATEMENTS IN THIS NEWS RELEASE THAT ARE NOT PURELY HISTORICAL ARE FORWARD-LOOKING STATEMENTS AND INCLUDE ANY STATEMENTS REGARDING BELIEFS, PLANS, EXPECTATIONS OR INTENTIONS REGARDING THE FUTURE.

EXCEPT FOR THE HISTORICAL INFORMATION PRESENTED HEREIN, MATTERS DISCUSSED IN THIS NEWS RELEASE CONTAIN FORWARD-LOOKING STATEMENTS THAT ARE SUBJECT TO CERTAIN RISKS AND UNCERTAINTIES THAT COULD CAUSE ACTUAL RESULTS TO DIFFER MATERIALLY FROM ANY FUTURE RESULTS, PERFORMANCE OR ACHIEVEMENTS EXPRESSED OR IMPLIED BY SUCH STATEMENTS. STATEMENTS THAT ARE NOT HISTORICAL FACTS, INCLUDING STATEMENTS THAT ARE PRECEDED BY, FOLLOWED BY, OR THAT INCLUDE SUCH WORDS AS “ESTIMATE,” “ANTICIPATE,” “BELIEVE,” “PLAN” OR “EXPECT” OR SIMILAR STATEMENTS ARE FORWARD-LOOKING STATEMENTS. RISKS AND UNCERTAINTIES FOR THE COMPANY INCLUDE, BUT ARE NOT LIMITED TO, THE RISKS ASSOCIATED WITH MINERAL EXPLORATION AND FUNDING AS WELL AS THE RISKS SHOWN IN THE COMPANY’S MOST RECENT ANNUAL AND QUARTERLY REPORTS AND FROM TIME-TO-TIME IN OTHER PUBLICLY AVAILABLE INFORMATION REGARDING THE COMPANY. OTHER RISKS INCLUDE RISKS ASSOCIATED FUTURE CAPITAL REQUIREMENTS AND THE COMPANY’S ABILITY AND LEVEL OF SUPPORT FOR ITS EXPLORATION AND DEVELOPMENT ACTIVITIES. THERE CAN BE NO ASSURANCE THAT THE COMPANY’S EXPLORATION EFFORTS WILL SUCCEED OR THE COMPANY WILL ULTIMATELY ACHIEVE COMMERCIAL SUCCESS. THESE FORWARD-LOOKING STATEMENTS ARE MADE AS OF THE DATE OF THIS NEWS RELEASE, AND THE COMPANY ASSUMES NO OBLIGATION TO UPDATE THE FORWARD-LOOKING STATEMENTS, OR TO UPDATE THE REASONS WHY ACTUAL RESULTS COULD DIFFER FROM THOSE PROJECTED IN THE FORWARD-LOOKING STATEMENTS. ALTHOUGH THE COMPANY BELIEVES THAT THE BELIEFS, PLANS, EXPECTATIONS AND INTENTIONS CONTAINED IN THIS NEWS RELEASE ARE REASONABLE, THERE CAN BE NO ASSURANCE THOSE BELIEFS, PLANS, EXPECTATIONS OR INTENTIONS WILL PROVE TO BE ACCURATE. INVESTORS SHOULD CONSIDER ALL OF THE INFORMATION SET FORTH HEREIN AND SHOULD ALSO REFER TO THE RISK FACTORS DISCLOSED IN THE COMPANY’S PERIODIC REPORTS FILED FROM TIME-TO-TIME.

THIS NEWS RELEASE HAS BEEN PREPARED BY MANAGEMENT OF THE COMPANY WHO TAKES FULL RESPONSIBILITY FOR ITS CONTENTS.

Disclaimer & Cookie Notice

Welcome to GOLDEA services for Professionals

Before you continue, please confirm the following:

Professional advisers only

I am a professional adviser and would like to visit the GOLDEA CAPITAL for Professionals website.

Cookie Notice

We use cookies to improve your experience on our website

Information we collect about your use of Goldea Capital website

Goldea Capital website collects personal data about visitors to its website.

When someone visits our websites, we use a third party service, Google Analytics, to collect standard internet log information (such as IP address and type of browser they’re using) and details of visitor behavior patterns. We do this to allow us to keep track of the number of visitors to the various parts of the sites and understand how our website is used. We do not make any attempt to find out the identities or nature of those visiting our websites. We won’t share your information with any other organizations for marketing, market research or commercial purposes and we don’t pass on your details to other websites.

Use of cookies
Cookies are small text files that are placed on your computer or other device by websites that you visit. They are widely used to make websites work, or work more efficiently, as well as to provide information to the owners of the site.