Skip to main content

Brunswick Exploration Drills 1.80% Li2O Over 37.2 Meters in New Mineralized Dyke at Mirage

Figure 1

Surface Map of the Mirage Project and Drill Holes Completed to Date
Surface Map of the Mirage Project and Drill Holes Completed to Date

Figure 2

Cross Sections A to A’ Along Dyke MR-6
Cross Sections A to A’ Along Dyke MR-6

MONTREAL, Jan. 18, 2024 (GLOBE NEWSWIRE) — Brunswick Exploration Inc. (TSX-V: BRW, OTCQB: BRWXF; “BRW” or the “Company”) is pleased to report final drill results from the Fall 2023 program at the Mirage Project, located in the Eeyou Istchee-James Bay region of Quebec. Drilling has outlined two new spodumene mineralized dykes (MR-5 and MR-6) with significant thickness and grade, all within the Central Zone.

Highlights include

  • MR-23-28 intersected high-grade mineralization of 1.80% Li2O over 37.2 meters starting from surface in newly discovered dyke MR-6 located 500 metres northeast of MR-3.
  • Evidence of potential stacking of dykes in Central Zone where MR-23-35 intercepted 11.5 meters grading 1.1% Li2O approximately 100 meters south of MR-3 in new dyke MR-5.
  • Hole MR-23-33 intercepted over 9 blind, stacked dykes over a down-hole length of approximately 95 meters with thickness varying from 0.8 to 7.3 meters.
  • All of the dykes announced in this NR are open along strike and at depth.
  • In the maiden drill program, 5 of the 6 dykes reported continuous high-grade mineralization (1.5+% Li2O) over significant width (10+ metres) all within a roughly 2 x 2 km dyke swarm.

Table 1: Drilling Highlight

Hole IDZoneDykeFrom (m)To (m)Length (m)Li2O%Ta2O3 (ppm)
MR-23-28CentralMR-63.840.937.21.80154
MR-23-29CentralMR-62.634.832.21.55168
MR-23-35CentralMR-534.546.011.51.10Assay pending

Mr. Killian Charles, President and CEO of BRW, commented: “I am very pleased with our maiden drill program at Mirage which successfully identified significant lithium mineralization in nearly all holes drilled. Importantly, all of the dykes drilled at Mirage remain open both along strike and at depth. Alongside the discovery of several blind dykes (predominantly in the Central Zone to date), several undrilled targets and a favorable structure in excess of twelve kilometres, we have built a strong foundation for continued exploration success at Mirage as we advance towards our Phase 2 drilling program scheduled to begin imminently.”

Table 2: Final Drill Results from 2023 Drill Campaign

Hole IDZoneDykeFrom (m)To (m)Length (m)Li2O%Ta2O3 (ppm)
MR-23-27SouthMR-4B107.7109.85.80.03472
MR-23-28CentralMR-63.840.937.21.80154
MR-23-29CentralMR-62.634.832.21.55168
MR-23-30CentralMR-61.726.224.61.75143
MR-23-31Central 15.116.41.30.78Assay pending
and  28.433.75.31.50Assay pending
and  42.446.64.21.13Assay pending
and  54.256.42.21.01Assay pending
MR-23-32Central 27.235.58.30.67Assay pending
and  43.446.02.61.55Assay pending
and  52.955.93.00.30Assay pending
MR-23-33Central 140.2144.44.21.85Assay pending
and  159.1162.23.10.74Assay pending
and  163.7164.50.80.34Assay pending
and  170.2171.00.80.95Assay pending
and  186.1188.72.6Assay pending
and  191.4192.30.90.63Assay pending
and  196.7203.77.0Assay pending
and  218.2220.22.01.77Assay pending
and  232.4234.92.5Assay pending
MR-23-34South 76.779.32.62.39Assay pending
MR-23-35CentralMR-534.546.011.51.10Assay pending
MR-23-36Central 38.542.03.51.30Assay pending
and  175.9178.22.31.02Assay pending
and  226.0234.68.60.60Assay pending


Central Zone Drilling

The company received from the laboratory the last batch assay results for 10 holes from its maiden drill program at Mirage. Intersections reported in this announcement confirm the discovery of multiple, new lithium mineralization in spodumene-bearing pegmatites in the Central Zone (Figure 1). Of these, MR-5 and MR-6 are discussed herein.

MR-6 Dyke

The high-grade MR-6 dyke is defined by three holes drilled in fan pattern which returned values of 1.80% Li2O over 37.2 meters (MR-23-28), 1.55% Li2O over 32.2 meters (MR-23-29), 1.75% Li2O over 24.6 meters (MR-23-30). As all drill holes started in the pegmatite, the true thickness of the dyke is unknown but assumed to be greater than 32m. The dyke reaches surface and is interpreted to have a shallow dip of 15 degrees toward the southeast. So far, the dyke is mapped at surface over 110m and traced down-dip over 100 m (Figure 2). The MR-6 dyke is located approximately 500 meters to the northeast and along strike of MR-3 where the company reported several intercepts over 40m of mineralized pegmatite with grade above 1% Li2O. However, due to significantly higher reported grade and much shallower dip, at this time, it is assumed to be a different dyke. No drilling was done between the two dykes and MR-6 remains open in all directions.

MR-5 Dyke

The MR-5 dyke is located approximately 100m south of MR-3 dyke and returned values of 1.1% Li2O over 11.5 meters (MR-23-35) within a larger 22 meters pegmatitic zone. The true thickness is estimated at 95% of the core length. Hole MR-23-35 followed up on the dyke intersected in MR-23-08 and is assumed to have a shallow dip of 25 degrees to the southeast. MR-5 does not outcrop at surface and is open in all directions. MR-5 proximity to MR-3 dyke potentially indicates that the structure is favorable for stacking.

Central Zone Deformation Corridor

To the south of MR-6, a major NE-SW deformation corridor transects the Mirage Project. A total of four holes (MR-23-31, -32, -33, -36) were drilled in the corridor. Unlike other holes drilled across Mirage, spodumene dykes are narrower but show multiple stacking over wider intercepts and maintain their high-grade nature.

Holes MR-23-31 and -32 were designed to test four small spodumene-bearing pegmatite outcrops mapped in 2023. Both holes intercepted six semi-continuous intervals of smaller (<10 meters), stacked spodumene-bearing pegmatite dykes gently dipping 30 degrees to the southeast over approximately 40m at a vertical depth 40 and 60 meters in MR-23-31 and MR-23-32 respectively. These dykes are located near and at high angles from the metabasalt and metasediment contact and all remain open in all directions. The most significant interval returned values of 1.50% Li2O over 5.3 meters and 1.13% Li2O over 4.2 meters in MR-23-31 respectively at 23m and 33m vertically from surface.

In the southeastern portion of the Central Zone, south of MR-23-31 and -32, MR-23-33 and MR-23-36 were blind holes that drilled and intercepted a series of pegmatite intervals mostly hosted in metabasalt. MR-23-33 outlined over 9 separate spodumene-bearing pegmatite dyke intervals (<10 meters) from 140.2 to 234.9m down hole and was stopped at 240m. The pegmatite dyke swarm represented roughly 32% of a 95m interval. Similar mineralization and results were observed in hole MR-23-36, 150m laterally to the west.

Figure 1: Surface Map of the Mirage Project and Drill Holes Completed to Date

Surface Map of the Mirage Project and Drill Holes Completed to Date

Figure 2: Cross Sections A to A’ Along Dyke MR-6

Cross Sections A to A’ Along Dyke MR-6

QAQC

All drill core samples were collected under the supervision of BRW employees and contractors. The drill core was transported by helicopter and by truck from the drill platform to the core logging facility in Val-d’Or. Each core was then logged, photographed, tagged, and split by diamond saw before being sampled. All pegmatite intervals were sampled at approximately 1m intervals to ensure representativity, and ¼ core splits were inserted regularly as duplicates. Samples were bagged; blanks and certified reference materials for lithium were inserted at regular intervals. Groups of samples were placed in larger bags, sealed with numbered tags, in order to maintain a chain of custody. The sample bags were transported from the BRW contractor facility to the ALS laboratory in Val-d’Or. All sample preparation and analytical work was performed by ALS. Samples were crushed in order for 70% of the material to pass through a 2mm screen (method CRU-31), a riffle split was made of a 1,000g sub-sample (SPL-21), and the split sample pulverized (PUL-31) to obtain more than 85% of the material inferior to 75µm. A 0.2g sub-sample of the pulverized fraction was dissolved in a sodium peroxide solution, prior to lithium analysis by ICP-AES according to the ALS method ME-ICP82b. All results passed the QA/QC screening at the lab and all inserted standard and blanks returned results that were within acceptable limits. All reported drill intersections are calculated on the basis of a lower cutoff grade of 0.10% Li2O, with maximum internal dilution of 1 meter. Host basalts adjacent to the dykes grade up to 0.3% Li2O but were excluded from the reported intersections. All drill hole collar, orientation and inclination data are available on the Company’s web site.

Qualified Person

The scientific and technical information contained in this press release has been reviewed and approved by Mr. François Goulet, Manager Quebec. He is a Professional Geologist registered in Quebec and is a Qualified Person as defined by National Instrument 43-101.

About Brunswick Exploration

Brunswick Exploration is a Montreal-based mineral exploration company listed on the TSX-V under symbol BRW. The Company is focused on grassroots exploration for lithium in Canada, a critical metal necessary to global decarbonization and energy transition. The Company is rapidly advancing the most extensive grassroots lithium property portfolio in Canada.

Cautionary Statement on Forward-Looking Information

This news release contains “forward-looking information” within the meaning of applicable Canadian securities legislation based on expectations, estimates and projections as at the date of this news release. Forward-looking information involves risks, uncertainties and other factors that could cause actual events, results, performance, prospects and opportunities to differ materially from those expressed or implied by such forward-looking information. Factors that could cause actual results to differ materially from such forward-looking information include, but are not limited to, delays in obtaining or failures to obtain required governmental, environmental or other project approvals; uncertainties relating to the availability and costs of financing needed in the future; changes in equity markets; inflation; fluctuations in commodity prices; delays in the development of projects; the other risks involved in the mineral exploration and development industry; and those risks set out in the Corporation’s public documents filed on SEDAR at www.sedar.com. Although the Corporation believes that the assumptions and factors used in preparing the forward-looking information in this news release are reasonable, undue reliance should not be placed on such information, which only applies as of the date of this news release, and no assurance can be given that such events will occur in the disclosed time frames or at all. The Corporation disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, other than as required by law. Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release.

Photos accompanying this announcement are available at: 

https://www.globenewswire.com/NewsRoom/AttachmentNg/3bc30b65-a757-4b67-941b-6010f8004524

https://www.globenewswire.com/NewsRoom/AttachmentNg/24a38c7c-2d4a-4f84-b388-3df4a6349f18

CONTACT: Investor Relations/information

Mr. Killian Charles, President and CEO (info@brwexplo.ca)

Disclaimer & Cookie Notice

Welcome to GOLDEA services for Professionals

Before you continue, please confirm the following:

Professional advisers only

I am a professional adviser and would like to visit the GOLDEA CAPITAL for Professionals website.

Cookie Notice

We use cookies to improve your experience on our website

Information we collect about your use of Goldea Capital website

Goldea Capital website collects personal data about visitors to its website.

When someone visits our websites, we use a third party service, Google Analytics, to collect standard internet log information (such as IP address and type of browser they’re using) and details of visitor behavior patterns. We do this to allow us to keep track of the number of visitors to the various parts of the sites and understand how our website is used. We do not make any attempt to find out the identities or nature of those visiting our websites. We won’t share your information with any other organizations for marketing, market research or commercial purposes and we don’t pass on your details to other websites.

Use of cookies
Cookies are small text files that are placed on your computer or other device by websites that you visit. They are widely used to make websites work, or work more efficiently, as well as to provide information to the owners of the site.