Skip to main content

Silver Hammer Mining Corp. Commences Phase I Drilling at the Silver Strand Mine in Idaho

Figure 1

Silver Strand Underground drill program in dark blue

Silver Strand Underground drill program in dark blue

VANCOUVER, British Columbia, Oct. 14, 2021 (GLOBE NEWSWIRE) — Silver Hammer Mining Corp. (CSE: HAMR / OTC: HAMRF) (“Silver Hammer” or the “Company”) is pleased to report that Phase I drilling has commenced at the Silver Strand Mine in Idaho.

Phase I drilling will include both underground drilling and select shallow surface drilling. Past production ceased at just 90 metres depth and this first phase of underground drilling will test immediately below what was historically mined at Silver Strand (see Figure 1.) while surface drilling will test for lateral vein extensions along strike and will step out to test surrounding targets.

Results from Phase I drilling are expected to provide valuable information regarding the plunge, depth, lateral expansion, and dip of the veins, to support the Company’s modelling and future phases of drilling. This information will also help the Company to set expectations for timing of an initial resource.

“By working closely with a local drilling company and the local forest service with a plan to use an innovative and environmentally friendly drilling method for limited surface drilling in addition to utilizing the existing infrastructure for underground drilling, we were able to obtain drilling permissions in an expedited time frame,” stated President Morgan Lekstrom. “The recently completed underground rehabilitation will enable us to achieve a better return on investment per metre drilled by targeting depth extensions from a drilling bay at 90 metres depth by allowing the drill bit to bypass significant overburden. We are also very excited to report that drilling at Silver Strand has already hit the vein and mafic dyke (magnetic portions of the rock) where we expected, but has also hit another vein on the opposite side of the mafic dyke.”

Figure 1. Silver Strand Underground drill program in dark blue
https://www.globenewswire.com/NewsRoom/AttachmentNg/59b21348-7e8b-4eb0-bf83-c01a0945d4b4

Qualified Person

Technical aspects of this press release have been reviewed and approved under the supervision of Philip Mulholland, P.Geo. Mr. Mulholland is a Qualified Person (QP) under National Instrument 43-101 Standards of Disclosure for Mineral Projects.

About Silver Hammer Mining Corp.

Silver Hammer Mining Corp. is a junior resource company advancing the past-producing Silver Strand Mine in the Coeur d’Alene Mining District in Idaho, USA, both the Eliza Silver Project and the Silverton Silver Mine in one of the world’s most prolific mining jurisdictions in Nevada and the Lacy Gold Project in British Columbia, Canada. The Company has commenced an initial drill program at Silver Strand that will test for silver and gold mineralization immediately below the mine’s lowest level extending only 90 metres below surface. Silver Hammer strives to become a multi-mine silver producer and will focus on near-term exploration and drilling plans at the Company’s Idaho and Nevada silver-gold assets.

*Mineralization hosted on adjacent and/or nearby properties is not necessarily indicative of mineralization hosted on the Company’s property.

On Behalf of the Board of Silver Hammer Mining Corp.

Morgan Lekstrom, President

Corporate Office: 551 Howe Street, Vancouver, British Columbia V6C 2C2, Canada

For more information, contact:

Kristina Pillon, Corporate Communications
Phone: 604.908.1695
Email: investors@silverhammermining.com

The CSE does not accept responsibility for the adequacy or accuracy of this release.

The Canadian Securities Exchange has neither approved nor disapproved the contents of this press release.

 

Disclaimer & Cookie Notice

Welcome to GOLDEA services for Professionals

Before you continue, please confirm the following:

Professional advisers only

I am a professional adviser and would like to visit the GOLDEA CAPITAL for Professionals website.

Important Notice for Investors:

The services and products offered by Goldalea Capital Ltd. are intended exclusively for professional market participants as defined by applicable laws and regulations. This typically includes institutional investors, qualified investors, and high-net-worth individuals who have sufficient knowledge, experience, resources, and independence to assess the risks of trading on their own.

No Investment Advice:

The information, analyses, and market data provided are for general information purposes only and do not constitute individual investment advice. They should not be construed as a basis for investment decisions and do not take into account the specific investment objectives, financial situation, or individual needs of any recipient.

High Risks:

Trading in financial instruments is associated with significant risks and may result in the complete loss of the invested capital. Goldalea Capital Ltd. accepts no liability for losses incurred as a result of the use of the information provided or the execution of transactions.

Sole Responsibility:

The decision to invest or not to invest is solely the responsibility of the investor. Investors should obtain comprehensive information about the risks involved before making any investment decision and, if necessary, seek independent advice.

No Guarantees:

Goldalea Capital Ltd. makes no warranties or representations as to the accuracy, completeness, or timeliness of the information provided. Markets are subject to constant change, and past performance is not a reliable indicator of future results.

Regional Restrictions:

The services offered by Goldalea Capital Ltd. may not be available to all persons or in all countries. It is the responsibility of the investor to ensure that they are authorized to use the services offered.

Please note: This disclaimer is for general information purposes only and does not replace individual legal or tax advice.