Day: May 27, 2024
Sarclisa accepted for FDA priority review for the treatment of transplant-ineligible newly diagnosed multiple myelomaFDA Priority Review granted based on positive results from IMROZ phase 3 study
If approved, Sarclisa would be the first anti-CD38 therapy in combination with standard-of-care treatment for patients with newly diagnosed transplant-ineligible multiple myeloma
Pivotal IMROZ phase 3 study results to be featured during oral presentation at the 2024 American Society of Clinical Oncology (ASCO) Annual MeetingParis, May 27, 2024. The U.S. Food and Drug Administration (FDA) has accepted for Priority Review the supplemental Biologics License Application (sBLA) for the investigational use of Sarclisa (isatuximab) in combination with bortezomib, lenalidomide and dexamethasone (VRd) for the treatment of patients with transplant-ineligible...
Exploration Results Meyas Sand Gold Project – Sudan
Written by Customer Service on . Posted in Public Companies.
Perth, May 27, 2024 (GLOBE NEWSWIRE) — EXPLORATION UPDATE FOR MEYAS SAND GOLD PROJECT – SUDAN
Perth, Western Australia/ May 27, 2024/Perseus Mining Limited (ASX/TSX: PRU) is pleased to provide an update on exploration activities and studies completed to date at its Meyas Sands Gold Project (MSGP) in Sudan.
The full release with drill results tables and figures is available on www.perseusmining.com, www.asx.com.au and www.sedarplus.ca.
Since acquiring the MSGP in May 2022, Perseus has focussed on the development of the Galat Sufur South (GSS) deposit, and when possible, has conducted infill resource definition drilling, sterilisation trenching and drilling, a passive seismic survey, hydrogeological, metallurgical, and geotechnical work in preparation for the inclusion of data in a Front-End Engineering and Design (FEED) Study...
Moblan drilling delivers thick, high grade intersections
Written by Customer Service on . Posted in Public Companies.
Latest results for 94 new drillholes totalling 20,735m for Sayona’s Moblan Lithium Project, Québec, Canada with highlights including:South Pegmatites:40.70m @ 1.52% Li2O from 130.50m in drillhole 1331-23-537
78.20m @ 1.55% Li2O from 51.50m in drillhole 1331-23-679
57.05m @ 1.48% Li2O from 41.15m in drillhole 1331-23-684Inter Pegmatites:44.75m @ 1.41% Li2O from 250.15m in drillhole 1331-23-461
49.70m @ 1.61% Li2O from 143.30m in drillhole 1331-23-503
45.00m @ 1.17% Li2O from 291.50m in drillhole 1331-23-513Moleon Pegmatites:30.20m @ 1.73% Li2O from 158.80m in drillhole 1331-23-552
44.25m @ 1.29% Li2O from 214.00m in drillhole 1331-23-582
42.75m @ 1.85% Li2O from 176.80m in drillhole 1331-23-583A
36.85m @ 1.77% Li2O from 181.95m in drillhole 1331-23-584
43.90m @ 1.66% Li2O from 139.90m in drillhole 1331-23-585Potential...